Our Projects

Floating, Water Adjacent, and Mixed Deployments coming in 2027.
Project Zeus

Project Zeus

Data Center Campus
500 MWGreenfieldMove-In 2028-H1FloatingLand-Based

Strategically sited adjacent to a CCGT power plant in Houston, this hybrid floating and land-based data center campus is engineered for resilience and performance: long-term PPAs secure attractive energy pricing, dual grid-interconnection points with full backup configurations ensure continuous uptime, layered physical security perimeters protect critical infrastructure, and integrated long-haul and metro network access brings high performance compute capacity directly to the urban core.

Project Sandpiper

Project Sandpiper

Floating Data Center
860 MWCaliforniaSan Jose Availability ZoneGreenfieldMove-In 2029

A large-scale floating campus in the San Jose availability zone enabling large HPC clusters with attractive power pricing close to major users.