Mousterian Logo
Projects Technical Company Contact Us
Projects Technical Company Contact Us

Our Projects

Floating, Water Adjacent, and Mixed Deployments coming in 2027.
Project Zeus

Project Zeus

Data Center Campus
500 MWGreenfieldMove-In 2028-H1FloatingLand-Based

Strategically sited adjacent to a CCGT power plant in Houston, this hybrid floating and land-based data center campus is engineered for resilience and performance: long-term PPAs secure attractive energy pricing, dual grid-interconnection points with full backup configurations ensure continuous uptime, layered physical security perimeters protect critical infrastructure, and integrated long-haul and metro network access brings high performance compute capacity directly to the urban core.

Mousterian logo
Projects Technical Company Contact
©2026 Mousterian, Inc. All Rights Reserved.
Privacy Policy